Sunday, February 13, 2011

Fall/Winter Work

Well, things are getting close to being done.  All of the major components are completed.  We mainly have doors and trim work to be done which will take awhile to finish.  The bathroom is fully functional at this point.  The water pressure for the shower is a little low, but it is usable.  A big thanks to everyone for their help.  Of course we can never thank Jon enough for all of his help (Jon now has his contractor's license).  Check out his website at http://jetcarpentry.com/.  Our friends, Jude and Alex, helped us install the last major item, the cork floor.  A long time friend of the family, Garth Steel Klippert , did the vanities and cut the counter tops made of paperstone.  He did a great job!  Check out more of his work at http://gsdb.blogspot.com/.  It would have been a much bigger job without them.  Whitney finally had some time to help as well.  Besides the cork floor, she pretty much sanded, painted and installed the drawer pulls on her make-up desk.  Check out the slideshow, "Fall/Winter Work" for the most up to date photos.